hit counter script

Advertisement

S4112-ON Series
Setup Guide

Advertisement

Table of Contents
loading

Summary of Contents for Dell EMC S4112-ON Series

  • Page 1 S4112-ON Series Setup Guide...
  • Page 2 A WARNING indicates a potential for property damage, personal injury, or death. © 2018 Dell Inc. or its subsidiaries. All rights reserved. Dell, EMC, and other trademarks are trademarks of Dell Inc. or its subsidiaries. Other trademarks may be trademarks of their respective owners.
  • Page 3: Table Of Contents

    Contents 1 About this guide................5 Related documents.................. 6 Information symbols................. 6 2 Site preparations................7 Site selection..................... 7 Cabinet placement................... 8 Rack mounting..................8 Switch ground...................8 Fans and airflow..................9 Power......................9 Storing components................10 3 S4112-ON Series Installation............11 Unpack...................... 11 Ground cable...................
  • Page 4 Chassis physical design................. 23 5 Support..................26 Contents...
  • Page 5: About This Guide

    About this guide This guide provides site preparation recommendations, step-by-step procedures for rack mounting and desk mounting, inserting modules, and connecting to a power source. CAUTION: To avoid electrostatic discharge (ESD) damage, wear grounding wrist straps when handling this equipment. WARNING: Only trained and qualified personnel can install this equipment.
  • Page 6: Related Documents

    S4112-ON Series Installation Guide • S4112-ON Series Release Notes • Open Networking Hardware Diagnostic Guide NOTE: For the most recent documentation, see Dell EMC support: www.dell.com/ support. Information symbols This book uses the following information symbols: NOTE: The Note icon signals important operational information.
  • Page 7: Site Preparations

    Site preparations The S4112-ON Series (S4112F-ON and S4112T-ON) switch is suitable for installation as part of a common bond network (CBN). You can install the switch in: • Network telecommunication facilities • Data centers • Other locations where the National Electric Code (NEC) applies For more information about the S4112-ON Series switch specifications, see Specifications.
  • Page 8: Cabinet Placement

    The ground path must be permanent. Switch ground Dell EMC recommends grounding your switch. Use the S4112-ON Series switch in a CBN. For more information, see Ground cable.
  • Page 9: Fans And Airflow

    Fans and airflow Fan installation is done as part of the factory install based on stock keeping unit (SKU) type. The S4112-ON Series switch has SKUs that support the following configurations: • AC PSU with PSU fan and system fans normal airflow •...
  • Page 10: Storing Components

    Storing components If you do not install your S4112-ON Series switch and components immediately, properly store the switch and all optional components following these guidelines: • Storage location temperature must remain constant. The storage range is from -40° to 65°C (-40° to 149°F). •...
  • Page 11: S4112-On Series Installation

    S4112-ON Series Installation To install the S4112-ON Series (S4112F-ON and S4112T-ON) switch, complete the installation procedures in the order presented in this section. Always handle the switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs). NOTE: ESD damage can occur if components are mishandled.
  • Page 12: Ground Cable

    Tma=40C, and an altitude operation of 3048m. The power cable is 10AWG, 16A minimum, with a 72V minimum rating. The ground cable is not included. To properly ground the chassis, Dell EMC recommends a one- or two-hole lug, M4 hole size. The ground lugs must be a UL-recognized, crimp-type lug.
  • Page 13: Rack Or Cabinet Installation

    NOTE: Coat the one-hole lug with an anti-oxidant compound before crimping. Also, bring any unplated mating surfaces to a shiny finish and coat with an anti-oxidant before mating. Plated mating surfaces must be clean and free from contamination. NOTE: The rack installation ears are not suitable for grounding. Before you install the switch into the dual-tray: Cut the ground cable (not included) to the desired length.
  • Page 14: Half-Ru Front-Rack Installation

    power ratings do not exceed the circuit capabilities. Overloaded power sources and extension cords present fire and shock hazards. • Elevated ambient temperature—If you install the switch in a closed rack assembly, the operating temperature of the rack environment may be greater than the room ambient temperature.
  • Page 15 Figure 2. Dual-tray and rack mounting rail Attach the rail to the dual tray. Slide the rail back until it locks into place. Repeat with the other side. Figure 3. Attach the dual-tray and rack mounting rails Install the dual tray inside the four-post rack. Rack mount screws are not included. Attach the front dual-tray switch rails to the four-post rack from the front.
  • Page 16 Figure 4. Attach the dual-tray front to the four-post rack front Attach the rear dual-tray switch rails to the four-post rack from the rear. Secure the dual tray to the rack using two user-supplied screws for each rack post. Figure 5. Attach the dual-tray rear to the four-post rack rear Tighten all mounting screws to securely mount the dual tray into the four-post rack.
  • Page 17: Switch Installation

    Figure 6. Secure the dual-tray in the four-post rack Switch installation Install one or two half-RU switches in the four-post rack-mounted dual tray. Install one switch into either dual-tray slot from the front. Figure 7. Install an S4112-ON Series switch The switch is fully inserted when it hits the stop feature on the dual tray.
  • Page 18: Switch Removal

    Figure 8. Dual-tray stop feature If you are installing two switches, insert the second switch in the open dual-tray slot. Switch removal Remove a switch from the dual tray from the front of the four-post rack. Push the front switch latches according to the latch arrows and pull out the switch. Figure 9.
  • Page 19: Dc Power Connections

    Figure 10. S4112-ON Series release arrow DC power connections Each DC PSU comes with a connector cable. One cable is provided for each DC PSU. S4112-ON Series Installation...
  • Page 20 Figure 11. DC power connector and wiring block Wiring block Power connector PSU connector Strip a 1/2 inch section of insulation from each of the power connector’s wires, as shown. Insert each of the power connector’s bare wire lengths into the wiring block. The blue wire is -48V, the black wire is the positive return, and the yellow/green wire is the ground wire, as shown.
  • Page 21: Optics Installation

    Secure the site’s DC power source wires to the other side of the wiring block, see steps 1 and 3. WARNING: Do not cross the wires. Insert the DC power connector into the power socket of the DC PSU. Ensure that the connector pins firmly seat and you hear the click of the power connector’s left and right levered clamps lock into place.
  • Page 22: Switch Power-Up

    Reinspect your switch before power up. Verify the following: • The equipment is properly secured to the rack. Dell EMC recommends properly grounding the switch. • The ambient temperature around the unit, which may be higher than the room temperature, is within the limits specified for the S4112-ON Series switch, see Specifications.
  • Page 23: Specifications

    Specifications This section lists the S4112-ON Series (S4112F-ON and S4112T-ON) switch specifications. CAUTION: Operate the product at an ambient temperature not higher than 45°C (113°F). CAUTION: Lithium Battery Caution: There is a danger of explosion if the battery is incorrectly replaced. Replace only with same or equivalent type of battery. Dispose of the batteries according to the manufacturer's instructions.
  • Page 24 –40° to 65°C (–40° to 149°F ) Storage humidity 5% to 95%, non-condensing S4112F-ON: 180W, 614 BTU/hr Maximum thermal output S4112T-ON: 200W, 682 BTU/hr Maximum operational altitude 10,000 feet (3,048 meters) Maximum non-operational altitude 39,370 feet (12,000 meters) Shock Dell EMC Spec SV0115 Specifications...
  • Page 25 Table 3. AC power requirements Parameter Specifications Power supply 100–240 VAC 50/60 Hz Maximum current draw per system 2A/1.7A at 100/120V AC 1A/0.8A at 200/240V AC S4112F-ON: 180 W Maximum power consumption S4112T-ON: 200 W S4112F-ON: 90 W Typical power consumption S4112T-ON: 120 W Table 4.
  • Page 26 The support site provides integrated, secure access to these services. To access the support site, go to www.dell.com/support/. To display information in your language, scroll down to the bottom of the web page and select your country from the drop-down menu.

This manual is also suitable for:

Emc s4112f-onEmc s4112t-on

Table of Contents