CAUTION: Do not use the mounted ReadyRails as a shelf or a
workplace.
NOTE: The illustrations in this document are not intended to represent a
specific switch.
1U Tool-less Configuration
To install the Dell ReadyRails system using the 1U tool-less configuration,
follow these steps.
1.
With the ReadyRails flange ears facing outward, place one rail between
the left and right vertical posts. Align and seat the back flange rail pegs in
the back vertical post flange. To see how the pegs appear in both the
square and unthreaded round holes, see item 1 in the following figure.
2.
Align and seat the front flange pegs in the holes on the front side of the
vertical post.
3.
Repeat this procedure for the second rail.
4.
To remove each rail, pull on the latch release button on each flange ear
and unseat each rail.
Figure 1. 1U Tool-less Configuration
Two-Post Flush-Mount Configuration
To install the Dell ReadyRails system using the two-post flush-mount
configuration, follow these steps.
1.
For this configuration, remove the castings from the front side of each
ReadyRails assembly. See item 1 in the following figure. Use a Torx driver
to remove the two screws from each front flange ear (on the switch side
Installation
7