hit counter script

Server (Pull-Out From The Rack) - NEC Express5800/120Rh-2 N8100-1061F User Manual

Hide thumbs Also See for Express5800/120Rh-2 N8100-1061F:
Table of Contents

Advertisement

9-16 Upgrading Your Server

Server (Pull-out from the Rack)

The server needs to be pulled out from the rack for installing/removing any components other than
the hard disk drives and power supply units.
Observe the following instructions to use the server safely. Failure to follow
these instructions may result in death or serious personal injury. See pages 1-3
to 1-8 for details.
1.
See the section "Preparing for Installation and Removal" described earlier to prepare.
2.
Unlock the front bezel with the security key and remove the front bezel.
3.
Loosen the two captive thumbscrews on the front panel.
4.
Hold the handles and slowly pull out the server from the rack until it locks.
When inserting the server back into the rack, push the release levers on the rails on the sides of the
server to unlatch the server. Be very careful not to get your finger caught in doing so.
Do not install the server on a rack with leaving covers removed.
Do not pinch your finger with mechanical components.
Note high temperature.
Do not pull out a device from the rack if the rack is unstable.
Do not leave more than one device being pulled out from the rack.
Security lock
Captive thumb screws
CAUTION
Handles

Advertisement

Table of Contents
loading

Table of Contents